Mining engineers inspecting ore at a project site
Case Studies

Projects Delivered Across Mining, Infrastructure & Eco-Engineering

From underground paste backfill stations to highway subgrade stabilisation and slope eco-restoration — every project below is powered by Tianshun cementing and stabilisation technology.

20+
Years in Service
9
Application Sectors
30+
Countries Served
100%
MSDS / COA Backed
Shunchang Integrated Mine Filling Plant
Mine Backfill

Shunchang Integrated Mine Filling Plant

Fujian, China 2023

Aerial view of our flagship cementing-powder production and mine paste-filling base, integrated with downstream non-ferrous mining operations.

  • Continuous 24/7 paste backfill supply
  • Closed-loop tailings utilisation
  • Annual throughput: 120,000 t binder
+410 m Decline Filling Station
Mine Backfill

+410 m Decline Filling Station

Fujian, China 2022

Dedicated silo, mixing plant and decline portal feeding cemented paste directly into underground stopes — engineered for zero-subsidence mining.

  • Vertical silo + twin-shaft mixer
  • Pipeline pumping to −300 m level
  • UCS @ 28 d ≥ 4.0 MPa
Underground Paste Backfill Pipeline
Mine Backfill

Underground Paste Backfill Pipeline

Non-ferrous mine, Jiangxi 2023

In-situ photo of pipeline delivery galleries — our cementing powder is pumped through these arteries to fill exhausted stopes with high-strength paste.

  • DN150 wear-resistant pipeline
  • Rheology tuned for 800 m horizontal run
  • Bleed water < 3%
Expressway Subgrade Stabilisation
Soil Stabilisation

Expressway Subgrade Stabilisation

Hebei Province 2024

Large-scale subgrade treatment of weak silty soils using our inorganic soil stabilizer — replacing lime / cement for a stronger, lower-carbon base layer.

  • 300,000 m² treated in one season
  • CBR uplift: 8% → 42%
  • 7-day UCS ≥ 2.5 MPa
High Slope Eco-Restoration — Phase 1
Slope Greening

High Slope Eco-Restoration — Phase 1

Guangxi karst region 2023

Hydroseeded slope before vegetation establishment. Our binder anchors the seed-soil matrix to vertical rock faces of up to 70°.

  • Spray-applied 8 cm growth medium
  • Wind & rain erosion resistant
  • Compatible with native seed mix
High Slope Eco-Restoration — Phase 2
Slope Greening

High Slope Eco-Restoration — Phase 2

Guangxi karst region 2024

Same site, one growing season later — full vegetation cover stabilises the slope, prevents runoff and reintegrates the cut with the surrounding landscape.

  • > 95% green-cover ratio
  • Root depth into substrate > 20 cm
  • Zero secondary maintenance for 18 months
Permeable Eco-Parking Pavement
Permeable Paving

Permeable Eco-Parking Pavement

Europe — reference project 2022

Grass-paver parking bays bound with our pervious cementitious matrix. Stormwater infiltrates directly to subsoil, eliminating surface ponding.

  • Permeability ≥ 1 × 10⁻³ m/s
  • Load class: passenger vehicles
  • 30%+ vegetated surface area
Urban Demolition Waste Recycling
Construction Waste

Urban Demolition Waste Recycling

Northern China metro 2024

Crushed C&D rubble bound with our recycling cementing powder to produce certified road-base aggregate — diverting demolition waste from landfill.

  • Replaces virgin aggregate 1 : 1
  • Strength grade up to C30
  • Verified by third-party lab
On-Site Technical Service & QA
Technical Service

On-Site Technical Service & QA

Open-pit operation, overseas client 2024

Our engineers on site sampling and assessing ore matrix to fine-tune binder formulation — every project is supported by full QA / QC and field calibration.

  • On-site formulation tuning
  • MSDS & COA issued per batch
  • Multilingual technical support
Field Gallery

Every site, every stage

A complete visual overview of recent Tianshun project sites — from underground galleries to greened mountainsides.

Shunchang Integrated Mine Filling Plant
Mine Backfill
Shunchang Integrated Mine Filling Plant
+410 m Decline Filling Station
Mine Backfill
+410 m Decline Filling Station
Underground Paste Backfill Pipeline
Mine Backfill
Underground Paste Backfill Pipeline
Expressway Subgrade Stabilisation
Soil Stabilisation
Expressway Subgrade Stabilisation
High Slope Eco-Restoration — Phase 1
Slope Greening
High Slope Eco-Restoration — Phase 1
High Slope Eco-Restoration — Phase 2
Slope Greening
High Slope Eco-Restoration — Phase 2
Permeable Eco-Parking Pavement
Permeable Paving
Permeable Eco-Parking Pavement
Urban Demolition Waste Recycling
Construction Waste
Urban Demolition Waste Recycling
On-Site Technical Service & QA
Technical Service
On-Site Technical Service & QA

Have a project in mind?

Tell us about your site conditions, tonnage and target performance. Our engineers will recommend a formulation — and back it with MSDS, COA and on-site technical support.